How It Works

From your first message to goods on the way, here is exactly what happens and how long each step takes.

Apparel design and development at BRETT

Production runs in our own factory in Dongguan, China, managed by our Taiwan team.

1. Inquiry and quote

Send your design, tech pack or photos of a reference garment, fabric direction, quantity and size range. See what to prepare.

2. Pattern making and first sample: 7–14 days

Our pattern makers work from your tech pack, or from clear front and back photos plus a size chart.

3. Fit review and second sample: about 30 days in total

Most styles need two sampling rounds. We adjust fit, fabric and details until the sample matches what you have in mind.

4. Approval and 30% deposit

Once you approve the sample, a 30% deposit by bank transfer starts your order.

Sourcing fabric for bulk production

5. Fabric and trim preparation: about 30 days

We order fabric and trims, inspect and pre-shrink the fabric, and prepare your labels, hang tags and packaging.

6. Bulk production and quality control: 25–35 days

Cutting, sewing, pressing, thread trimming and inspection. Every size is checked against your approved sample, within half an inch on key measurements.

Bulk production of ready-to-wear garments

7. Balance and shipment

The remaining 70% is due before shipment. Goods ship once paid. We can arrange sea freight or work with your forwarder.

Timeline at a glance

Stage Time
Sampling (two rounds) about 30 days
Fabric and trims about 30 days
Bulk production 25–35 days
First order total about 90 days

Repeat orders are faster because pattern and fabric are already confirmed.

Get a quote

Send us your design, photos or a reference garment, your target quantity per style and color, and your size range. Our Taiwan team will reply with sampling options and a quote.

Get a quote →