Most new clothing brands hit the same wall: the factory they like asks for 500 or 1,000 pieces per style. For a first collection that is too much cash and too much risk. The good news is that low MOQ manufacturers exist. The trick is knowing what to ask so that "low MOQ" does not turn into hidden costs or weak quality.
Key takeaways
- MOQ can be counted per style, per color or per fabric. Always ask which one a factory means.
- BRETT works from 100 pieces per style, with at least 50 pieces per color.
- Plan about 90 days for a first order: fabric and trim sourcing, sampling, bulk production and sea freight.
- Ask about sampling fees, sample rounds, quality checks and design exclusivity before you commit.
What MOQ actually means
MOQ (minimum order quantity) is the smallest order a factory will accept. Always ask how it is counted:
- Per style: the total for one design across all sizes and colors.
- Per color: the minimum for each colorway, sometimes called MCQ.
- Per fabric: some fabrics have their own minimum at the mill, especially custom-dyed or functional fabrics.
Factory note
At BRETT our MOQ is 100 pieces per style, with at least 50 pieces per color. A style in two colors needs at least 50 of each.
Why low MOQ is harder than it looks
Cutting, sewing and quality checks take almost the same setup time for 100 pieces as for 1,000. Fabric mills also have their own minimums. A factory that offers low MOQ needs good fabric sources, an efficient sample room and a team used to small runs.
Five questions to ask a low MOQ factory
- Is the MOQ per style or per color, and does it change for special fabrics?
- How much is the sampling or pattern fee, and is it refunded when I order production?
- How long does the first sample take, and how many rounds should I plan for?
- Who checks quality, and what tolerance do you work to?
- Will my designs be offered to other brands?
A realistic timeline for a first order
- MOQ: 100 pcs per style, at least 50 pcs per color (cut-and-sew)
- First sample: 7–14 days; most styles need two sampling rounds, about 14–28 days in total
- First contact and fabric and trim sourcing: 7–14 days
- Bulk production: 25–35 days, depending on style difficulty and quantity
- Payment: 30% deposit by bank transfer, 70% before shipment
For a first collection, plan for about 90 days in total, including 7–30 days of sea freight.

Low MOQ tips that save money
- Start with fewer styles and more depth per style.
- Keep to one or two colors per style for your first drop.
- Use stock fabrics where you can, and save custom fabric for your hero piece.

Ready to start your collection?
Send us your design, photos or a reference garment, plus your target quantity per style and color. Our Taiwan team will reply with sampling options and a quote.
Get a quoteMore guides
5 Things to Prepare Before Contacting a Clothing Factory
From Sketch to Bulk: The Activewear Development Process and Timeline
OEM vs ODM vs Private Label: Which Is Right for Your Brand?